Latest HQ Updates:
April 2012
The HQ Team is finalizing its designs for spaces required by the office, bookstore, and library. We have selected an architect,
structural engineer, and mechanical, electrical, and plumbing (MEP) Engineer for our building. In a few weeks we will introduce them to you.
All the utilities have been changed over from the Shriners to the NSS. The Shriners have moved out of the front existing offices
and are continuning to pack their stuff up and move out of the back areas. The building keys were a mess. The Shriners literally
had over fifty keys to various doors and users. We have changed the locks and have three keys now!
Volunteer jobs have been posted. Check them out. There is a link at the bottom of this page. More news to be posted....